Hines VA Spinal Cord Injury Outdoor Recreation Area

Hines VA Spinal Cord Injury Outdoor Recreation Area
Client:
Department of Veterans Affairs, National Cemetery Administration
Location:
Edward Hines Jr. VA Hospital, Hines, IL
Value:
$1,788,738.18

Hines VA Spinal Cord Injury Outdoor Recreation Area

AmeriTech created an accessible outdoor recreation area to support veterans receiving spinal cord injury care at Hines VA. The project brought together recreational courts, accessible walkways, a shade canopy, and supporting utilities and drainage. Through careful field verification and coordination with the VA and design team, AmeriTech resolved complex site conditions and delivered a space designed to help veterans stay active, connect with others, and participate in therapeutic activities outdoors.

Scope of Work

Created accessible recreational courts, walkways, and outdoor activity spaces

Constructed a shade canopy with supporting foundations, roofing, and electrical and plumbing systems

Installed drainage, utilities, paving, fencing, and landscaping, including a rain garden

Challenges & Solutions
Challenge
Solution
01
01
Undocumented utilities and differences in existing site elevations created conflicts with planned drainage and grading.
01
AmeriTech verified field conditions and coordinated with the VA and design team to resolve conflicts and incorporate revised utility, grading, and drainage designs.
02
02
Design revisions and seasonal work suspensions required changes to the construction sequence across closely connected trades.
02
AmeriTech adjusted sequencing, advanced work in available areas, and coordinated subcontractors around updated plans to maintain progress.
03
03
Persistent rain threatened completion of the recreation area ahead of a major VA event.
03
AmeriTech brought in large temporary tents so crews could continue weather-sensitive work and have the space ready in time for the event.
Project Highlights

Delivered Results

Created accessible outdoor spaces for patient wellness and therapeutic recreation

Added shaded gathering areas for connection and time outdoors

Improved drainage and site infrastructure to support lasting accessibility and performance