West Haven VA Steam Pipe Repair and Replacement

West Haven VA Steam Pipe Repair and Replacement
Client:
Department of Veterans Affairs, National Cemetery Administration
Location:
West Haven VA Medical Center, West Haven, CT
Value:
$1,372,100.00

West Haven VA Steam Pipe Repair and Replacement

AmeriTech completed steam pipe repair and replacement at West Haven VA Medical Center, improving essential infrastructure while keeping critical hospital services operational. The project included steam distribution repairs, sewer piping replacement, and repairs to a corroded fire suppression main. Using 3D scanning, carefully sequenced work, and strict confined-space and infection control measures, the team increased condensate return from 13% to 89% and avoided an estimated $3.2 million in emergency repairs. The improvements strengthened system reliability and helped protect the hospital’s ability to care for veterans.

Scope of Work

Replaced approximately 300 linear feet of steam piping, rebuilt four steam trap stations, and replaced 10 valves

Replaced approximately 400 linear feet of deteriorated sewer piping and fittings

Repaired steam system welds and supports and replaced a corroded fire suppression main

Challenges & Solutions
Challenge
Solution
01
01
Crews needed to repair aging utilities in confined underground corridors with temperatures reaching 99°F.
01
AmeriTech used continuous air monitoring, temperature controls, and strict energy isolation procedures. Matterport 3D scans supported planning and reduced unnecessary confined-space entries.
02
02
Steam, sewer, and fire protection repairs required careful coordination to protect patients and maintain critical hospital services.
02
AmeriTech sequenced repairs with hospital staff and used sealed barriers, HEPA filtration, and negative air systems. Surgical and emergency departments remained fully operational throughout the work.
Project Highlights

Delivered Results

Increased condensate return from 13% to 89%, improving steam system performance

Avoided an estimated $3.2 million in emergency repairs

Maintained critical hospital operations while restoring essential infrastructure